Estimate net savings, return on investment, break-even point, optional financing payments, and cost comparisons over 10, 15, and 20 years.
Financing Details
Results
Selected turbine model:-
Selected tower height:-
Selected MSRP / system cost:$0.00
Estimated fuel cost per kWh:$0.00/kWh
Usable kWh counted toward savings:0 kWh
Unused turbine production:0 kWh
Estimated fuel savings per year:$0.00
10-year net savings after turbine cost:$0.00
15-year net savings after turbine cost:$0.00
20-year net savings after turbine cost:$0.00
10-year ROI:0%
15-year ROI:0%
20-year ROI:0%
Estimated break-even point:0 years
Financing Results
Amount not financed / upfront cost:$0.00
Estimated monthly payment:$0.00/month
Total paid financing over term:$0.00
Total interest paid over term:$0.00
Estimated yearly financing payments:$0.00
Cost Comparison
This graph compares total annual cost without the turbine versus total annual cost with the turbine. The with-turbine line includes the turbine cost. If financing is selected, it includes upfront cost plus yearly financing payments until the financing term ends.
Total Cost Comparison
10-Year Cost Without Turbine$0.00
10-Year Cost With Turbine$0.00
15-Year Cost Without Turbine$0.00
15-Year Cost With Turbine$0.00
20-Year Cost Without Turbine$0.00
20-Year Cost With Turbine$0.00
Note: This calculator provides an estimate only. Actual savings may vary based on fuel cost, generator efficiency, financing terms, customer electricity use, storage capacity, site conditions, and system performance.
Use left/right arrows to navigate the slideshow or swipe left/right if using a mobile device
Choosing a selection results in a full page refresh.
Press the space key then arrow keys to make a selection.